• Home
  • O nas
  • Oferta
  • Nasi partnerzy
  • Sklep
  • Kontakt
Construction of main City water supply pipeline. 500mm large water pipeline with gate valves, 250mm branch. Pipes joined with new blue Gate valves and new black waga multi joint members.

Construction site, excavator wearing metal pipe

Worker in safety clothes drive valve conduit on City potable water pipe joined with new black waga multi joint members into old pipeline system. Control check of finished repaired piping before covering by clay. Asphalt isolation.


ZAPRASZAMY
DO KONTAKTU

Kontakt

Energas

ul. Warszawska 2, 07-410 Ostrołęka

T: (+48) 029 769 31 58, 760 08 83

E: biuro@energas.pl

NIP: 7582147376

Godziny otwarcia:

pn / pt: 7.00 – 18.00

sob: 7.00 – 14.00

WIĘCEJ
POLITYKA PRYWATNOŚCI
CREATED BY WILD HEAD STUDIO. ALL RIGHTS RESERVED.